Displaying report 1-1 of 1.
Reports until 00:08, Sunday 29 November 2015
H1 General
patrick.thomas@LIGO.ORG - posted 00:08, Sunday 29 November 2015 - last comment - 01:30, Sunday 29 November 2015(23791)
Current State
I believe I have moved IM1 and IM2 to there approximate positions before the HAM2 ISI trip (alog 23777). I moved IM1 in PITCH from 800 to 592. I moved IM2 in PITCH from 17980 to 17232.

I started an initial alignment. I got to the point where both ALS_XARM and ALS_YARM were at the INITIAL_ALIGNMENT state and was waiting for the ASC convergence. However when I got to GREEN_WFS_OFFLOADED the Y arm dropped in power. I am now struggling to bring it back.
Comments related to this report
patrick.thomas@LIGO.ORG - 00:10, Sunday 29 November 2015 (23792)
And of course we just had a GRB alert.
patrick.thomas@LIGO.ORG - 00:31, Sunday 29 November 2015 (23793)
Got back to GREEN_WFS_UNLOADED. This time the power stayed high in both arms.
patrick.thomas@LIGO.ORG - 00:52, Sunday 29 November 2015 (23794)
Trying to lock X arm on IR for INPUT_ALIGN. Put IM1 and IM2 back.
patrick.thomas@LIGO.ORG - 00:53, Sunday 29 November 2015 (23795)
Got to INPUT_ALIGN.
patrick.thomas@LIGO.ORG - 00:58, Sunday 29 November 2015 (23796)
Moved IM1 in PITCH from 800 to 592 and moved IM2 in PITCH from 17980 to 17232 again. IR in x arm dropped briefly but then recovered.
patrick.thomas@LIGO.ORG - 01:12, Sunday 29 November 2015 (23797)
Got to SRC_ALIGN. Had to move SRM by hand.
patrick.thomas@LIGO.ORG - 01:16, Sunday 29 November 2015 (23798)
Finished initial alignment.
patrick.thomas@LIGO.ORG - 01:29, Sunday 29 November 2015 (23799)
DRMI locked!
patrick.thomas@LIGO.ORG - 01:30, Sunday 29 November 2015 (23800)
Lost lock on DRMI locked.
Displaying report 1-1 of 1.