Displaying report 1-1 of 1.
Reports until 09:04, Tuesday 12 December 2017
H1 PSL
jason.oberling@LIGO.ORG - posted 09:04, Tuesday 12 December 2017 - last comment - 09:37, Friday 15 December 2017(39731)
PSL Weekly FAMIS Tasks (FAMIS 4023 & 8452)

This morning I completed the weekly PSL FAMIS tasks.

HPO Pump Diode Current Adjust (FAMIS 8452)

With the ISS OFF, I adjusted the operating current of the HPO DBs.  The changes are summarized in the below table, I also attached a screenshot of the PSL Beckhoff main screen for future reference.

  Operating Current (A)
Old New
DB1 53.2 53.4
DB2 55.0 55.2
DB3 55.0 55.2
DB4 55.0 55.2

I did not adjust the operating temperatures of the DBs.  The HPO is now outputting 155.4 W and the ISS is back ON.  This completes FAMIS 8452.

PSL Power Watchdog Reset (FAMIS 4023)

I reset both PSL power watchdogs at 16:55 UTC (8:55 PST).  This completes FAMIS 4023.

Images attached to this report
Comments related to this report
jason.oberling@LIGO.ORG - 09:37, Friday 15 December 2017 (39777)

Attached is the running trend of diode box current increaes since we started weekly adjustments.  The large increases required at the end of November seem to have leveled off back to the more normal 0.2 A weekly increase.  We are continuing to monitor this.

Images attached to this comment
Non-image files attached to this comment
Displaying report 1-1 of 1.