Displaying report 1-1 of 1.
Reports until 00:00, Saturday 14 September 2019
LHO General
thomas.shaffer@LIGO.ORG - posted 00:00, Saturday 14 September 2019 (51938)
Ops Eve Shift Summary

TITLE: 09/14 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 112Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: My shift started with the IFO engaging soft loops, and Jeff and Sheila discussing the recent lock losses from this state. Made it up with no trouble this time and we have been locked since. After getting to low noise the squeezer manager reported "green power stabilization railed". Sheila tweaked a pico and all is well since then.
LOG:

Displaying report 1-1 of 1.