Ops Shift Transition: 09/21/2019, Owl Shift 07:00 – 15:00 (00:00-08:00) - UTC (PT)
State of H1: Locking
Intent Bit: Commissioning
Weather: 0-5 mph wind
Primary 0.03 – 0.1Hz: 0.01 um/s
Secondary 0.1 – 0.3Hz: 0.3 um/s
Outgoing Operator: Corey
Quick Summary: Locking after EY timing error. At ENGAGE_SOFT_LOOPS.