EE (Phil & Aaron) fed cables and I attached most of them to the TS Mock Feedthrus. Still need to connect the Coil cables once names are verified. All the In-vac cables are connected to the feed thru. Still need to position & connect up the CPS satellite rack. Also need to dress up the T240 cable from Stage1 to Stage0 and other misc cable securing.