Reports until 17:35, Thursday 13 February 2014
H1 SEI
hugh.radkins@LIGO.ORG - posted 17:35, Thursday 13 February 2014 (10076)
ETMY Cabling Status on Test Stand

EE (Phil & Aaron) fed cables and I attached most of them to the TS Mock Feedthrus.  Still need to connect the Coil cables once names are verified.  All the In-vac cables are connected to the feed thru.  Still need to position & connect up the CPS satellite rack.  Also need to dress up the T240 cable from Stage1 to Stage0 and other misc cable securing.