8:50 PSL Check ok. NOTE: ISS Diffracted Power is low (1.4%) and unstable with peaks over 20%. It should be 5-15%) 9:00-12:00 Going to End X to do cabling – Luis/Filiberto 10:00-12:00 Baffle work (disassembling contaminated scrapple baffle, searching for parts for arm cavity installation, and general cleanup) in LVEA West bay – Mitchell 11:01-11:03 DAQ restart – Dave 11:10-11:45 heading into the LVEA to get parts – Gerardo 12:12-12:15 Change h1iopsusey model to remove the DC OSEM component from the software watchdog – Dave 14:15-15:51 PCAL assembly on H2 PSL – Joe 14:22- Taking some parts to End Y – Corey 15:02-15:50 Back into the LVEA West bay (Searching and organizing Baffle parts – Mitchell 15:59 DAQ restart - Dave NOTE: I noticed that the ISS Diffracted Power has been unstable today. It was about 1.4% in the morning with high peaks over 20% during the day (is this normal?). Based on one of the PSL trainings it should be 5-15%. I have added some pics from today and one from the last 5 days.