Reports until 16:00, Friday 14 February 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Friday 14 February 2014 - last comment - 16:02, Friday 14 February 2014(10111)
Ops Shift Summary
8:50      PSL Check ok. NOTE: ISS Diffracted Power is low (1.4%) and unstable with peaks over 20%. It should be 5-15%)
9:00-12:00 Going to End X to do cabling – Luis/Filiberto
10:00-12:00 Baffle work (disassembling contaminated scrapple baffle, searching for parts for arm cavity installation, and general cleanup) in LVEA West bay – Mitchell
11:01-11:03 DAQ restart – Dave
11:10-11:45 heading into the LVEA to get parts – Gerardo
12:12-12:15 Change h1iopsusey model to remove the DC OSEM component from the software watchdog – Dave 
14:15-15:51 PCAL assembly on H2 PSL – Joe
14:22-   Taking some parts to End Y – Corey
15:02-15:50 Back into the LVEA West bay (Searching and organizing Baffle parts – Mitchell
15:59   DAQ restart - Dave

NOTE: I noticed that the ISS Diffracted Power has been unstable today. It was about 1.4% in the morning with high peaks over 20% during the day (is this normal?). Based on one of the PSL trainings it should be 5-15%. I have added some pics from today and one from the last 5 days.
Comments related to this report
andres.ramirez@LIGO.ORG - 16:02, Friday 14 February 2014 (10112)


		
		
Images attached to this comment