Reports until 23:13, Friday 14 February 2014
daniel.sigg@LIGO.ORG -
posted 23:13, Friday 14 February 2014 - (10118)
(Blue Team)
Short progress report:
-
All necessary electronics modules and chassis have been installed in EX.
-
All cables were installed.
-
Beam profiles were measured and the sensor heads are installed on ISCTEX.
-
The isc model has been updated to include code for the ALS WFS.
-
The asc model has been updated to receive the angular feedback signals and to provide the green transmitted light.
-
Slow inputs into the alignment servos are available to support camera spot position of ITM and ETM.
-
Feedback paths are available to control the ITM and ETM mirror orientations but not TMS.
-
The ALS end station medm screen has been updated to include the ALS WFS.
-
The slow controls system in EX has been updated to support the new whitening chassis.
-
There are currently no readbacks for the demodulator RF monitors.
More details to follow.