The BS IS tripped on GS-13 watchdog at 1328 utc this morning. Traffic, wind, something--plotting scripts still not functioning...
Anyway, I brought it back to lvl2 with 750mHz blends on stage2 and T250s on all Stage1 blends except T100mHz_0.44 blends on X & Y dofs.
I reset the target positions, there was about 700nrads on RX and <4um on Z, all other shifts were less. Please let us know if this impacts any alignments. This allowed for a one button isolation.
I reported the WD plotting issue mentioned by hugh last week. Details can be found in LHO aLog #10057
I am not sure what is going on yet, scripting or server access issue, but I am looking into it.
The plotting scripts work for the HAM-ISI. WD plotting is still disfunctional on the BSC. I think it is a scripting issue in that case, and I am working towards fixing it:
The BSC-ISI WD plotting software was fixed, see LHO aLog #10258 for more details.