Reports until 14:35, Friday 21 February 2014
H1 INS (ISC, SEI, SUS)
hugh.radkins@LIGO.ORG - posted 14:35, Friday 21 February 2014 (10252)
EndY ISI/Cartridge ready for Install in chamber

Except for Corey doing some last moment inventorying, the Cartridge is ready for install.  The Test Stand is stripped of all field cables, in-vac cables are all tucked away, accessible areas of the ISI were wiped down (not too much collected it seemed,) and covers are on ready to drop around Stage0 when the assembly lifts from the Stand.  No incumberances seen at this time.

Thanks to Betsy & Mitchell.