Replaced the incorrect feed thrus with the needed 3-Pin power style. Then completed the cable attachment, cable strain relief and finally the easier half of the Dial Indicators. Almost that is--I was short three 5" bolts to strain relieve some SUS cables on the South side. I must have cut myself a little to close wrt inventory. But generally, all the really needed dirty work is done.
The Apollo crew got Test Stand, extra Spiral stair case, 3P spreader, and a few other things from the VEA.
The cleaning crew jumped right on as soon as I was out of the way--a few dust alarms with that work.
Crud--I forgot the CPS sync cables...Will be routed on the South & West side--away from the open door.