While in the chamber, we also connected the 5 SUS and 1 ring heater cables to the feedthru and confirmed signal throughput on the 5 sus. We pulled the C3 covers from both of the ETMy and TMSy suspensions before installing the corner cube.
Jason and Doug should have a clear shot of the corner cube (and probably the edges of the optic) through the ACB from the spool. We await X,Y,Z measurements.
In-vacuum ETMy SUS cable serial numbers:
Floor 1 of CB D1000225-S1104879 to D1000234-88"- 941
Floor 2 of CB D1000225-S1l04881 to D1000234-88" - 942
Floor 3 of CB D1000225-S1104882 to D1000234-88" - 940
FLoor 4 of CB D1000225-S1104880 to D1002522 - 924
Floor 1 of CB D1000225-S1104883 to RH cable
Floor 2 of CB D1000225-S1104878 to D1002522 - ? (ETMy L2 stage)
All are plugged into feedthrus on the F3 port of the chamber as per the WBSC10 D1200111 cable routing doc.