Here is the list of commissioning task for the next 7-14 days:
Green team:
-
Automate auto-alignment for green.
-
Add normalization and trigger to REFL_DC_BIAS path.
-
Use REFL_DC_BIAS to stabilize the red.
-
Noise measurement between red and green stabilized on red.
-
Make a mode scan of the red resonances.
-
Commission the length feedback path to the ETM top suspension point to suppress microseism.
Red team:
-
Investigate the robustness of the 3f lock in presence of an arm cavity.
-
Diagonalize PRM/PR3 drive.
-
Center the red QPDs in EX.
-
REFL_A commissioning.
-
PRC length measurements.
-
Optimize the thermal compensation of ITMY.
-
Investigate the REFLAIR45 whitening filter issue.
Blue team (ALS WFS):
-
Beam quality investigation (potenial)..
-
Check out actuation function and commission compensation filter.
-
ETMX optical lever.
-
Automate drift alignment.
Blue team (ISCTEY):
-
Move tablel to EY
-
Cut panel and install light pipe.
-
Install the on table cabling.
-
Check out ALS electronics in EY.
-
Prepare noise eater remote switch.
-
Add WFS.
TMS:
-
Beam alignment in final position.
SEI/SUS team:
-
Measure length-to-angle TFs
-
ETMX drive diagonalization for length and angle.
-
ITMX drive diagonalization for angle.