Reports until 15:18, Tuesday 12 July 2011
LHO FMCS
kyle.ryan@LIGO.ORG - posted 15:18, Tuesday 12 July 2011 (1046)
Changed gate valve configuration of X-arm
Opened GV8*Hard-closed GV14*Dumped GV20 gate annulus accumulated gas into aux. cart*Opened GV20*Finished opening GV15 then hard-closed GV15 -> At this point X1 hydrogen is being pumped by temporary 75 l/s ion pump connected to CP2's 1.5" purge valve and X2 hydrogen is being pumped by IP12