Reports until 15:29, Friday 07 March 2014
H1 CDS
cyrus.reed@LIGO.ORG - posted 15:29, Friday 07 March 2014 (10613)
h1pemmy Rack and Stack

Cyrus R., Jim B.

We racked the computer and IO chassis for h1pemmy today at the mid-station.  All of the computing parts are connected, the computer is attached to the network, and the timing chassis is patched through to the master fanout in the MSR. We boot tested the front end as well, without running any models, and Jim verified the BIOS settings.  We are now waiting for an AA chassis with the appropriate PEM modifications to complete the physical install (and in-rack cabling for said chassis has not yet been done).  Models for the FE will also need to be completed/compiled, and the rtsystab/etc. updated.