corey.gray@LIGO.ORG - posted 09:41, Friday 07 March 2014 - last comment - 15:46, Friday 07 March 2014(10604)
EY TMS Cable Inventory Map

With Jim needing to connect In-Vac cables to feedthrus today, I wanted to update the EY TMS Cable Table (mainly to show recent change of swapping damaged D1000223 cable with D1000225).  All of this follows the BSC10 Cable Routing Configuration (D12000111) & is in the following ICS Assy Load.

In-Air Cable
 
Chamber
feed-thru
Seismically-Responsible Cables Cable Bracket In-Vac Cable Cable Bracket
on TMS
In-Vac Component
: Not sure of name : E6-7C1 D1000225 s/n S1104782
*no feedthru screws?
CB-5 , 1st Floor D1000234 s/n96-911 no CB OSEMS:  Face1, Face2, Face3, Left
: Not sure of name : E6-7C2 D1000225 s/n S1104778
*no feedthru screws?
CB-5 , 2nd Floor D1000234 s/n96-901 no CB OSEMS:  Right, Side, ---, ---
: Not sure of name : F2-2C1 D1000924 s/n S1104106
*no feedthru screws?
CB2 , 1st Floor (was 3rd Floor of BSC6 CB) D1000568 s/nS1104468 CB-primary, 1st floor Green QPD (D1000231 s/n C2Q001 aka S1400085)
: Not sure of name : F2-1C2 D1000924 s/n S1104469 CB2 , 2nd Floor (was 2nd Floor of BSC6 CB) D1000568 s/nS1104109 CB-primary, 2nd floor Red QPD (D1000231 s/n C4Q001 aka D1400087)
: Not sure of name : F2-1C1 D1000223 s/n S1104077
*no feedthru screws?
CB1 , 1st Floor (was 1st Floor of BSC6 CB) D1000921 s/nS1104116 CB-entry, 2nd floor Picomotors (D1000238 s/n1104586)
: Not sure of name : F2-2C2

D1000225 s/nS1106887 (replacing D1000223)

 

CB1 , 2nd Floor (was 4th Floor of BSC6 CB) D1000921 s/nS1104114 CB-entry, 1st floor Beam Diverter (D1000237 s/nS1104289)
Comments related to this report
betsy.weaver@LIGO.ORG - 15:41, Friday 07 March 2014 (10616)

Jim and Travis connected all of the TMS cables to the in-vacuum feedthrus.  This required completely rerouting 2 of the cables which were destined for feedthru's further away than where they were found mounted.  None of them are screwed in.  Although the ones that Corey mentions in the table above are missing hardware, they are a tight fit on the feedthru so I would advise just leaving them as is.  The task of adding the screws to the connectors is too risky for the cable this late in the game.  Adding the screws requires one to partially disassemble the cable which could cause a break inside of the connector.

keita.kawabe@LIGO.ORG - 15:46, Friday 07 March 2014 (10618)

And I enabled the damping and it's working.

However, it seems like LF coil is totally out, so TMSY might not be completely free.