Reports until 16:47, Friday 07 March 2014
H1 SEI (AOS, INS)
hugh.radkins@LIGO.ORG - posted 16:47, Friday 07 March 2014 (10622)
WBSC10 ETMY SEI HEPI Springs adjusted for ACB Load

Tweeked the DSCW Springs to pull the system back up from the additional ACB weight.  We adjusted things attempting to bring the Dial Indicators back to the post final alignment numbers Jim recorded on 5 March.  There is a 10mil (1/4mm) west shift but we are still well within the +-3mm tolerance.  Otherwise we have less than 0.1mm vertical shift and much less than that N/S.

So, ready for HEPI Actuators.