Here is the list of commissioning task for the next 7-14 days:
Green team:
-
Tune auto-alignment for green.
-
Look for clipping in green transmission.
-
Improve injected beam quality.
-
Investigate low frequency noise as function of angular motion.
-
Make a mode scan of the red resonances.
-
Commission the length feedback path to the ETM top suspension point to suppress microseism.
Red team:
-
Investigate the coupling of the arm cavity 3f lock in presence of an arm cavity.
-
Diagonalize PRM/PR3 drive.
-
Center the red QPDs in EX.
-
Gouy measurement in PRC
-
Investigate the REFLAIR45 whitening filter issue.
Blue team (ALS WFS):
-
Beam quality investigation (potenial).
-
Automate drift alignment.
Blue team (ISCTEY):
-
Install cables to EY.
-
Cut panel and install light pipe.
-
Check out ALS electronics in EY.
-
Prepare noise eater remote switch.
-
Add WFS.
TMS:
-
ETMY beam alignment in final position.
SEI/SUS team:
-
ETMX drive diagonalization for angle (0.5 day).
-
ITMX drive diagonalization for angle (1 day).
-
ITMY drive diagonalization for length/angle (4 day).