All actuator sub assemblies have been completed. Time with Jim is required to add these sub assemblies to the ISI. All of the flexure sub assemblies 0-1, and 1-2 have been completed. The granite table has been cleared in preparation for monolithic plates, which were brought over to the staging building this afternoon by Apollo.