Staging building, 3IFO (unit 2) progress
All actuator sub assemblies have been completed. Time with Jim is required to add these sub assemblies to the ISI. All of the flexure sub assemblies 0-1, and 1-2 have been completed. The granite table has been cleared in preparation for monolithic plates, which were brought over to the staging building this afternoon by Apollo.