Reports until 17:36, Monday 17 March 2014
H1 TCS (TCS)
greg.grabeel@LIGO.ORG - posted 17:36, Monday 17 March 2014 (10802)
TCS chiller lines
David Hosken, Thomas Vo, Greg Grabeel
Ran the chiller pumps starting from around 2pm until 5pm. Only one small leak on the loop back hose at BSC 3 was found. BSC 1 had a flow rate of 7 lpm when running in a partial bypass pressure of 24 psi. BSC 3 had a flow rate of 7.5 lpm when running at a partial bypass pressure of 21 psi. Both were running at 20* C and had a very minimal fluid level drop. Hopefully a longer test tomorrow will yield the same positive results. Good job Apollo.