H1 TCS (TCS)
aidan.brooks@LIGO.ORG - posted 18:01, Wednesday 19 March 2014 (10878)
H1 TCS CO2 main install - mechanical room cabling/power supplies

Aidan, Thomas, Dave H.

We spent most of today hooking up cables in the mechanical room. Both chillers now have DAC control (although the output channels are still to be configured). We installed most of the TCS cables in the CER too. A few of the long cables (cables X&Y: 46 and 47) are in back to front: we need to pull them out and install them flipped around (we're not going to use gender changers as we'd need too many of them).

Status is current in the attached PDF.