aidan.brooks@LIGO.ORG - posted 17:48, Friday 21 March 2014 (10929)
TCS CO2X installation work - plumbing nearly finished

Aidan, Dave H.

We thoroughly wiped downThe CO2PX table and enclosure today. Most of the plumbing is installed - we're going to connect the laser and RF driver and test for leaks on Monday.

The chiller and CO2 laser current and voltage calibrations have been applied to the H1TCSCS front end model. I recorded a safe burt restore snap with these calibrations and the chillers set up to 20C. 

The L1-TCS-R1 rack was installed in the HAM4-BSC2-BSC3 vertex and a cable tray was run to it.

We're getting a large shipment of the remaining CO2P equipment on Monday.