The crew re-installed the BSC flooring and worked on the second wipe-down starting from the collar section. Cheryl got TCS fit check taken care of just after lunch and then wipe-down continued. The upper section was completed before end of shift. We also continued to move equipment from BSC-7 to BSC-8 as time permitted.