Here is the list of commissioning task for the next 7-14 days:
Green team:
-
Generate a new calibrated spectrum covering the very low frequencies.
-
Look for clipping in green transmission.
-
Make a mode scan of the red resonances.
-
Test the length feedback path to the ETM top suspension point to suppress microseism.
Red team:
-
Center the red QPDs in EX.
-
RF REFLAIR45 whitening.
Blue team (ALS WFS):
-
Remeasure alignment sensing matrix.
-
High bandwidth WFS.
-
Automate drift alignment.
Blue team (ISCTEY):
-
PLL fiber locking.
-
Prepare noise eater remote switch.
-
Add WFS.
SEI/SUS team: