0817 - Praxair arrives 0845 - H2-PSL work on Diode Room enclosure begins 0900 - RichardM at EX testing dust monitors, affecting weather stations and systems there 0930 - Paradise Water arrives 0945 - GregorioT at MY 1110 - Nor-Cal visits Hugh 1125 - MichaelR in Diode Room 1251 - Betsy and Richard out to SUS stand in LVEA 1300 - Rai Weiss lecture: "Introduction to LIGO" 1500 - EY, LSB Fiber Lab, LVEA entrance alarming erratically 1600 - Keita begins transition to Laser Hazard 1615 - JonathanB to EY to check Pcal stand 1645 - LVEA in laser hazard (PSL contractors are done)