Aidan. Dave H. Greg G. Thomas V.
We have, basically, finished installing all the electronics and cabling on the TCSX table. There are a few outstanding issues (summarized in the attached PDF). The ones that are preventing us from turning on the laser are listed below.
We hope to address all these early on Monday to get the laser running to check the output power.
Chiller settings:
We adjusted the bypass valve on the back of the TCSX chiller to achieve the following settings (to mimic what's at LLO)
Flow rate: 3.4GPM
Pressure: 60.5PSI
Laser housing leak.
The replacement laser installed on the TCSX table also has a slow leak from the laser housing (in the same place as the first one) - about 1 drip every 5 minutes. We will check the output power of this laser before we pull it. See photos 3 & 4