jeffrey.bartlett@LIGO.ORG - posted 11:28, Friday 04 April 2014 (11175)
Grout Removal from EY Op-Lev Pier
   The excess grout found on the Op-Lev receiver pier at End-Y has been removed. The grout was kept damp during the removal process to hold down dust contamination. Dust counts were monitored during the process and although elevated no readings over 9000 0.3 micron particles per sample time were recorded. The surrounding floor area has been recleaned.   