Since Saturday the ODC for the PSL and (obviously) IMC have looked a little odd. They both keeping reporting very short, quick times when both the systems are not 'good'. These happen throughout the day as you can see by the two attached plots which show yesterday's activities (you can see more of these plots on the summary pages - https://ldas-jobs.ligo-wa.caltech.edu/~detchar/summary/). Just wanted to check you knew about this and if so is this nothing to worry about? Thanks!
This was another iteration of the ISS actuation running into its range limit.