Reports until 15:54, Tuesday 08 April 2014
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:54, Tuesday 08 April 2014 (11226)
Ops Summary
LVEA Laser Hazard

Nitrogen delivery to Mid-X
Ed Watt – Insulation on X-Arm

08:45 Jodi – Working at Mid-Y
08:45 Ken – Replacing flow bench fan motors in Optics Lab
08:57 Filiberto – Camera work at End-Y
09:38 Sheila & Alexa – Alignment work at End-X
09:30 Corey – Survey of ITMX spool cameras
09:42 Schneider Electrical contractor on site working on GC UPS system with Richard
09:50 Jonathan – Restarting the aLOG
09:50 Aaron – Cabling work in LVEA
10:00 Rick, Justin, Peter & Cris – Cleaning up in the H1-PSL enclosure
10:04 BSC2 – HEPI & ISI watchdogs tripped
10:06 BSC1 – SUS, HEPI, & ISI watchdogs tripped
10:15 Schneider Electrical contractor on site working on CDS UPS system with Richard
10:30 Praxair – Nitrogen delivery to Mid-X
11:25 Cyrus – Outside internet & phones are down due to fiber & copper cut at 400 area
12:30 Betsy & Travis – Working in the LVEA SUS Test Stand area
12:30 BSC9 – SUS, HEPI, and ISI watchdogs tripped
12:50 Richard – Changing dust monitor #5 (Beer Garden) to fixed vacuum connection
12:54 Corey – Going to End-X TMS lab
13:15 M itch & Scott – Taking forklift to Mid-X to get BSC plates
13:20 Corey – Going to End-Y
13:30 Michael – Survey tour in LVEA
13:35 Hugh & Greg – Replacing parker valve at HMA4
13:40 Cyrus – Going to End-Y
13:45 Richard – Working on dust monitor #5 tubing
14:06 Alastair & Dave – Turning on CO2 TCS-X laser 
14:20 BSC2 – HEPI, ISI watchdogs tripped – Ken working on cabling near BSC2
14:44 Kyle – going to End-Y working on BSC6