LVEA Laser Hazard Nitrogen delivery to Mid-X Ed Watt – Insulation on X-Arm 08:45 Jodi – Working at Mid-Y 08:45 Ken – Replacing flow bench fan motors in Optics Lab 08:57 Filiberto – Camera work at End-Y 09:38 Sheila & Alexa – Alignment work at End-X 09:30 Corey – Survey of ITMX spool cameras 09:42 Schneider Electrical contractor on site working on GC UPS system with Richard 09:50 Jonathan – Restarting the aLOG 09:50 Aaron – Cabling work in LVEA 10:00 Rick, Justin, Peter & Cris – Cleaning up in the H1-PSL enclosure 10:04 BSC2 – HEPI & ISI watchdogs tripped 10:06 BSC1 – SUS, HEPI, & ISI watchdogs tripped 10:15 Schneider Electrical contractor on site working on CDS UPS system with Richard 10:30 Praxair – Nitrogen delivery to Mid-X 11:25 Cyrus – Outside internet & phones are down due to fiber & copper cut at 400 area 12:30 Betsy & Travis – Working in the LVEA SUS Test Stand area 12:30 BSC9 – SUS, HEPI, and ISI watchdogs tripped 12:50 Richard – Changing dust monitor #5 (Beer Garden) to fixed vacuum connection 12:54 Corey – Going to End-X TMS lab 13:15 M itch & Scott – Taking forklift to Mid-X to get BSC plates 13:20 Corey – Going to End-Y 13:30 Michael – Survey tour in LVEA 13:35 Hugh & Greg – Replacing parker valve at HMA4 13:40 Cyrus – Going to End-Y 13:45 Richard – Working on dust monitor #5 tubing 14:06 Alastair & Dave – Turning on CO2 TCS-X laser 14:20 BSC2 – HEPI, ISI watchdogs tripped – Ken working on cabling near BSC2 14:44 Kyle – going to End-Y working on BSC6