Yesterday, Scotty and I were able to populate the 400+ 1/4-20 hardware into the stage 2 closeout plate cover, as well as attach the back and side ribs. Today, I made a cable kit for 3IFO BSC unit 2. Unit 3 will need 4 cables tested before it is a complete kit. All bolts connecting the closeout plate and closeout plate cover were torqued to spec. Locker sub-assemblies have begun. General cleanup and shelf organization is also ongoing.