Here is the list of commissioning task for the next 7-14 days:
Green team:
-
Look for the source of the 1/f noise.
-
Look for clipping in green transmission.
-
Make a mode scan of the red higher order modes.
-
Test the length feedback path to the ETM top suspension point to suppress microseism.
Red team:
-
Center the red QPDs in EX.
Blue team (ALS WFS):
-
High bandwidth WFS.
-
High bandwidth PZT servos.
Blue team (ISCTEY):
-
Reflected beam quality investigation.
-
Add WFS cabling.
SEI/SUS team:
-
Assess performance.
-
ETMY SEI commissioning.
-
ETMY SUS commissioning.