Here is the list of commissioning task for the next 7-14 days:
Blue team (Y-arm):
-
Establish green cavity locking.
-
Find best alignment in corner for both red and green.
-
Look at separation of the two green transmitted beams.
-
PDH transfer function/noise measurements/model.
-
Test WFS cabling.
Green team (X-arm):
-
Noise hunting.
-
Investigate power/gain dependence of COMM PLL PD.
-
Revisit the WFS with the now improved beam quality.
-
Look for clipping in green transmission.
-
Make a mode scan of the red higher order modes.
Red team:
-
Center the red QPDs in EX.
SEI/SUS team:
-
Change UIM drive strength in EX/EY.
-
Commission EX ESD drive.
-
Commission high bandwidth length drive to SUS/ESD.