Displaying report 1-1 of 1.
Reports until 17:42, Tuesday 22 April 2014
H1 ISC
alexan.staley@LIGO.ORG - posted 17:42, Tuesday 22 April 2014 - last comment - 08:55, Wednesday 23 April 2014(11516)
EY measurements

(Keita, Alexa)

A more in depth alog will be posted later about what we did today at EY. For now I have attached the data for the OLTF we measured (mag --> 122.txt, phase --> 123.txt). The UGF was about 2.3kHz with a phase margin of a little less than 60 deg. The phase shifter was adjusted to 23ns. The PDH REFL servo board settings were as follows:

We also measured the peak to peak of the PDH error signal and found it to be ~816mVpp.

Non-image files attached to this report
Comments related to this report
alexan.staley@LIGO.ORG - 08:55, Wednesday 23 April 2014 (11525)

We remeasured the green power along ISCTEY (its possible we had the wrong laser setting on the powermeter when we measured this last):

  • Out of laser: 32mW
  • Before first Faraday: 29mW
  • Out of first Faraday: 26.5mW
  • After EOM: 25.5mW
  • After second Faraday: 21.5mW
  • Before pick off: 21.4mW
  • After pick off: 18mW
Displaying report 1-1 of 1.