patrick.thomas@LIGO.ORG - posted 18:02, Monday 28 April 2014 (11610)
Ops Summary
CDS workstations were frozen and not accepting logins. Cyrus fixed this with a reboot of cdsfs0.

08:52 Jeff and Andres to set up dust monitors near HAM 4,5,6
09:15 Hugh to HAM4
09:24 RO in alarm, sent email to Ski
09:56 Hugh out of HAM4, HEPI is locked, doors are still on
10:24 Matt, David working on TCS HWS table
10:46 Travis heading out to LVEA test stand area, cleanup work
10:52 Email from Ski, RO is fixed
10:53 Richard into H1 diode room
11:09 Jeff looking for serial cables near HAM1, HAM2
11:16 Hugh to lock HAM4 ISI
11:57 Hugh out of HAM4, ISI is locked
12:14 I reset the WD for the BS ISI, Guardian brought it back
?     I reset the WD for ETMY HEPI
12:27 Richard to end X to look at power supply
12:31 Monthly phone test of Hanford site emergency alert system
12:35 Jeff done installing dust monitor at HAM4 at location 1
12:47 Karen to end Y to clean
12:59 I ran the script to isolate ETMY HEPI to level 1
13:34 I restarted the video4 computer and the FOMs
13:37 Justin transitioned the LVEA to laser HAZARD
13:37 Karen back from end Y
13:42 Vern, Matt and David working on TCS rotation stage in LVEA
13:51 I reset the WD for ETMY HEPI. I ran the script to isolate ETMY HEPI to level 1
13:56 Jeff installed a dust monitor at location 6 inside the clean room over HAM 6
14:05 Richard to end X to look at high voltage supply
14:58 Richard back from end X, working on dust monitor in diode room