Bubba and I spent some time down at Y-end with Fabrice looking at the cramped conditions in the VEA with the BSC ISI in mind. Fabrice is drafting a brief report to post to the DCC regarding our observations. The gist of the report: space is very tight and detailed communication/coordination will be required for install to go relatively smoothly.