Reports until 20:16, Wednesday 30 April 2014
H1 AOS
matthew.heintze@LIGO.ORG - posted 20:16, Wednesday 30 April 2014 (11664)
TCS update----steaming forward now

(Aidan B, David H, Thomas V, Alastair H, Matt H)

 (Note this is talking about TCSx table)

So finally some success. The first polariser after the laser was moved from before the AOM to after the AOM (and positioned such that the transmitted beam from the AOM goes through the polariser but the first order beam does not). It was then quite easy to alter the polarisers so that I got a minimum power reflected of off the 2nd polariser after the Beckhoff controlled HWP of 4.5 mW when in CW mode (HWP setting of 36.4 degrees gave this maximum power). The power transmitted onto the high power, power meter was 44W. (see top drawing on attachment).

 

We now can begin aligning in earnest again. However as we want to start running the laser around the clock soon, we started putting some other provisions in place first.

I also was going to put in the PD's that will be used for the Intensity stabilisation as they arrived today. However they dont physically fit. So we are going to have to come up with a different layout. Aidan is currently looking at what we will do. We also tried to put a breaker box supplied by Ben Abbott between the ISS box and the feedthrough. We had some issues with the connectors at the feedthrough working so we reverted back to the old setup. David was modifying so that we can try again tomorrow to connect this up

We have continued aligning after the polarisers and now have the 1st flipper mirror, lens and 2" steering mirror aligned. I thought this to be a good stopping point for the night as I am confident I can get the rest aligned tomorrow now. I have put a beam dump after this mirror to dump the beam into, so the laser can be started up at any stage if I am not here and all beams should be dumped. (see second drawing in attachment of sketch what done thus far).The Beckhoff controlled HWP has also been set to 36.4 degrees and so should dump the majority of the power into the water cooled beam dump.

 

Pic 3 shows the table layout as currently done

Pic 4 the water cooled beam dump (note hose clamp holds temperature sensor in place)