8:00 Crystal chiller refilled (180 ml added)- Operator 8:51 GV5 and GV7 soft closing – Kyle 8:56-14:11 Heading to the TCSx area – Matt/David 9:06-9:58 Heading into the LVEA (supervision) – Mike 9:16-11:45 Going to End Y for ESD work – Richard/Filiberto 9:4412:04 Contamination Control work – Jeff B/Margot 9:49-11:47 HEPI Pump #8 maintenance – Hugh/Cori 9:50-12:10 HAM4 Scraper baffle work – Betsy 9:54-11:39 Heading into the LVEA for SR3 alignment setup – Jason 10:10-12:00 Cavity baffle work in LVEA test stand West bay area – Travis/ Mitchell 10:30 Reset of HEPI L4C Accumulated WD Counters – Operator 10:38-12:00 Heading to End Y to set up a camera – Sheila 11:25- Shutting down fw0 to transfer trend data – Jame B. 12:49-14:00 Cleaning work at End Y – Karen 12:49- Cleaning work at End X/Mid X – Chris 13:19- Working in the Optics Lab – Justin 13:26-15:25 Back to Cavity baffle work in LVEA test stand West bay area – Travis/ Mitchell 14:16 LVEA transitioned to LASER HAZARD - Justin