Displaying report 1-1 of 1.
Reports until 16:03, Thursday 08 May 2014
LHO General
patrick.thomas@LIGO.ORG - posted 16:03, Thursday 08 May 2014 (11765)
Ops summary
08:33 Jeff and Andres heading out to work on SR3
08:58 Apollo done craning box for Joe D. at mid Y
09:19 Betsy going into HAM4, baffle and payload work
09:32 Let car from fire department in through gate
09:45 Praxair driver called to report that he was 10 - 15 minutes away
09:47 Travis and Margot heading out to work on the ACB in the LVEA test stand
Rick investigating PSL ISS locking problems. He adjusted the ISS reference signal (H1:PSL-ISS_REFSIGNAL) from -1.79 to -1.69 and the ISS locked with ~ 8% diffracted power.
David H. going to get parts from the LVEA X slab, then Hartman sensor work for ~30 minutes.
10:27 David H. done, out of LVEA
10:56 Jeff and Andres done at HAM5
11:03 Sheila working on the end Y ISC table
12:24 Justin transitioning the LVEA to laser hazard for TCS work
12:35 School tour in control room
13:03 Thomas V. restarted the H1ECATC1 system manager to add links for the TCS Y rotation stage. He then went to connect the stage to the H1 PSL ENV Beckhoff chassis (requiring a power cycle of this chassis).
13:10 John W. to end Y chiller yard to look at water system
14:24 Hugh heading out to add dummy mass payload to ISI table in HAM5
15:45 I updated the conlog channel list using the file that Dave generated yesterday. The number of unmonitored channels is taking a long time to come down.
Displaying report 1-1 of 1.