H1 TCS
thomas.vo@LIGO.ORG - posted 17:28, Thursday 15 May 2014 (11925)
TCS Progress
Hosken, Grabeel, Vo

CO2X:
- Laser left on running overnight again.
- Prepare gig-E camera infrastructure for wiring and software.

CO2Y:
- Rotation Stage working, turns out that the motor power cable  at the feed through was not plugged in.
- Starting to connect up temp. sensors on table, looking for the custom clamps that mount the sensors.
 
HAM4 HWS:
- Alignment laser is the wrong wavelength for the dichroic mirror which is HR at 650-900nm and HT at 500-550nm.
- Lens mounts readied for install in-vac