IAS: J. Oberling
SUS: B. Weaver
The fine pitch/yaw alignment of the SRM surrogate was completed this morning (actually, no alignment was required. Upon setting up equipment to measure the pitch/yaw it turns out we got everything in spec during the rough alignment last Friday). My equipment is still set up until I get word from SUS that the suspension is healthy; I will also post final alignment numbers at this point.