Today, Jeff is on operator duty so I tagged back in on HAM 5. While Jason was resettting his equipment, I worked on -
- cable routing for SR3, including switching the cables in the bracket since they were mounted backwards.
- positioning all of the lower stage AOSEMs on SR3.
- removing yaw adjustment hardware and torqued remaining dog clamps.
- cable routing on SRM.
- resetting the SRM open light gains/offsets with Arnaud (and creating the safe_snap once set) - Note, this was done because it was last done on a different set of electronics/cables. Currently, all of the OSEMs are backed out and reading open light - I'll resume setting these tomorrow.
- staging the dog clamps for the upcoming OFI and 3-baffle installs on this table.