SLED work held off doors to be installed on HAM5 after confirmation from SEI septum to be installed between HAM5 and HAM6 HEPI is locked Thomas V. installing software for HWS camera Richard fixing cables for WFS at end Y Peter NOT working in H2 PSL enclosure, waiting on missing screws Field trip expected in control room around 11:00