Reports until 08:37, Thursday 29 May 2014
LHO General
patrick.thomas@LIGO.ORG - posted 08:37, Thursday 29 May 2014 (12134)
Installation meeting notes
SLED work held off
doors to be installed on HAM5 after confirmation from SEI
septum to be installed between HAM5 and HAM6
HEPI is locked

Thomas V. installing software for HWS camera

Richard fixing cables for WFS at end Y

Peter NOT working in H2 PSL enclosure, waiting on missing screws

Field trip expected in control room around 11:00