doors being craned for HAM5 and rigged such that closing the gate valve is not required 08:40 Kyle to start pump for RGA on BSC8 (WP 4647) 08:46 Aaron and Filiberto to end Y to fix short in WFS cables 08:47 Jeff B. to HAM5 to take PET swipe 09:07 Hugh to HAM5 to move equipment out of the way for door installation 09:08 Arnaud to HAM5 to take hammer measurements 09:22 Richard to end Y to drop components off for Aaron and Filiberto 09:30 Travis to LVEA test stand area to retrieve documents 10:05 Praxair driver approximately 15 minutes away 10:31 Luis Z. to end Y to install grounding wrist strap connectors on the electronics racks 10:50 Jeff B. and Andres done at HAM5 11:27 Corey to LVEA to put away equipment 12:13 Praxair truck leaving 13:11 Jodi, Travis and Betsy to the LVEA west bay 13:22 Kingsoft water to take water samples 13:27 Hugh to LVEA test stand to work on sub-assemblies for 3rd IFO ISIs 15:21 Keita to end Y to work on WFS 15:48 The septum has been installed between HAM5 and HAM6. The doors are tacked on HAM5. Sheila is transitioning the LVEA to laser hazard.