LVEA transitioned to laser SAFE
Teams taking fiducial measurements (ITMs/ETMs/OpLevs)
Ready to vent all three corner station volumes after lunch
Good results from Thomas measurements on the stability of RH over the weekend
HAM4/5 doors and HAM6 septum in place
HAM6 SLED ready to install, on hold for now
need visual inspect on HAM6 cabling lengths
Apollo restoring beer garden cleanroom---coupling with BSC1/3
installation of TCS table stops on hold
need to lock HEPI for BSC1/3 due to potential contact with HEPI crossbeams
need to protect TCS mirrors during in chamber work