H1 SUS
betsy.weaver@LIGO.ORG - posted 16:05, Wednesday 04 June 2014 - last comment - 16:25, Tuesday 10 June 2014(12211)
H1 ITMx Deinstallation underway

(Betsy, Travis, Danny, Margot)

Today we (undid some work! - ha):

 

- Swung the ACB back with it's swing-away hardware

- Put a TFE cap on the TCS steering mirror right in the line of foot-traffic and floor removal for protection

- Removed the stiffening braces and wedges (and ~40 fasteners) from the ITMx QUAD

- Removed 3 of the floor panels and removed the sleeve stiffening structure from the QUAD

- Started disconnection of all top stage OSEMs and cabling to lower stage OSEMs on QUAD

- Staged the QUAD hanger hardware and elevator adapter parts

- Richard swapped out my dead backup PS for the elevator - thx, RM for promptness

- Collected the witness plates/samples from BSC 1 and cleaned flooring there

Images attached to this report
Comments related to this report
betsy.weaver@LIGO.ORG - 16:06, Wednesday 04 June 2014 (12212)

Jim apparently attempting to hang himself from a support tube:

Images attached to this comment
betsy.weaver@LIGO.ORG - 16:07, Wednesday 04 June 2014 (12213)

Travis breaking back - you can either see it or get an arm in there to adjust it, but you can't do both:

Images attached to this comment
betsy.weaver@LIGO.ORG - 16:25, Tuesday 10 June 2014 (12295)

Besides the sleeve and pile of larger parts removed from a QUAD during chamber de/installation (shown in picture above), following is a picture of all of the fasteners, nuts, etc that also get removed from the QUAD (the pan was empty when we started):

Images attached to this comment