(Betsy, Travis, Danny, Margot)
Today we (undid some work! - ha):
- Swung the ACB back with it's swing-away hardware
- Put a TFE cap on the TCS steering mirror right in the line of foot-traffic and floor removal for protection
- Removed the stiffening braces and wedges (and ~40 fasteners) from the ITMx QUAD
- Removed 3 of the floor panels and removed the sleeve stiffening structure from the QUAD
- Started disconnection of all top stage OSEMs and cabling to lower stage OSEMs on QUAD
- Staged the QUAD hanger hardware and elevator adapter parts
- Richard swapped out my dead backup PS for the elevator - thx, RM for promptness
- Collected the witness plates/samples from BSC 1 and cleaned flooring there
Jim apparently attempting to hang himself from a support tube:
Travis breaking back - you can either see it or get an arm in there to adjust it, but you can't do both:
Besides the sleeve and pile of larger parts removed from a QUAD during chamber de/installation (shown in picture above), following is a picture of all of the fasteners, nuts, etc that also get removed from the QUAD (the pan was empty when we started):