filiberto.clara@LIGO.ORG - posted 17:28, Friday 06 June 2014 (12251)
AA AI chassis rework
Per bugzilla integration issue 463, looked at AA/AI chassis to verify units have the proper insulating film used to isolate the -15V regulators to the chassis metal wall. 

All SUS AA/AI chassis in the CER have been modified or verified to have the appropriate insulating film.

S1100318 S1105214 S1105311 S1105301 S1105305 S1200297 S1200299 S1200300 S1200301 S1200281 S1200298 S1202115 S1202091 S1202111 S1202112 S1202113 S1202114 S1202110 S1100323 S1100334 S1100322 S1105310 S1105304 S1105302 S1105303 S1100324 S1104376 S1100319 S1107602 S1105298 S1105307 S1104366 S1103817 S1104353 S1202535 S1202538 S1202534 S1202607 S1202608 S1202606 S1202613 S1103953 S1103952 S1105308 S1105309 S1105297 S1202537 S1202536 S1202533 S1202539 S1202540

All SEI AA/AI chassis in the CER have been modified or verified to have appropriate insulating film.

S1203356 S1203357 S1203131 S1203329 S1203133 S1203036 S1202072 S1202073 S1202069 S1202074 S1202075 S1202068 S1202070 S1202071 S1203361 S1203359 S1203134 S1203358 S1203360 S1203135 S1203330 S1203331 S1203108 S1203098 S1203099 S1203144 S1203033 S1203268 S1203103 S1203104 S1203105 S1203332 S1203136 S0900066 S1300137 S1300133 S1300134 S1300141 S1300143 S1300610

Both SUS and SEI electronics have been reconnected and powered up. All units were placed back in appropriate rack and slot location.

Will need to coordinate with Keita when we can do the ISC AA/AI electronics in the CER and LVEA racks without interfering with HAM6 work.

All AA/AI electronics in both end stations still need to be verified sometime next week.