8:00 Work on Genie and Forklift behind the Highbay – Mid Columbia Forklift 9:13- 11:38 Heading to HAM6 to continue on ISI work – Hugh 9:22- AA-AI Chassis modifications for ISC in Electronics room – Filiberto/Aaron 9:28- Going to EndX to grab some parts to work on HAM6 – Corey 10:00-12:11 Baffle work in LVEA (West bay) – Gerardo/Scott 10:30-Heading into HAM6 to do some testing – Corey/Keita 13:00- Back into LVEA (West bay) for more Baffle work– Gerardo/Scott 13:13- Installing SUS Watchdog chassis and running cable at EndY – Filiberto/Aaron 13:51- Dump unpumped volume seen by PT246 into RGA turbo*isolated turbo from RGA*open 10" BT valve thus exposing RGA and PT246 to BT* Begin scanning at MidY/EndY – Kyle 13:55- 14:45 Heading back to HAM6 to continue on ISI work – Hugh 14:07- De-install receiver pylon for PCAL welding at EndX VEA – Thomas 14:15- Heading into the LVEA to relocate dust monitor – Jeff B. 14:35-Going into the H2 PSL enclosure – Peter 14:54 SPRAGUE on site. 15:00 EX VEA transitioned to laser SAFE